Steel Gantry

This project included a steel gantry (~12m height lattice tower) and several other steel structures for the Fujeij Wind Park HV substation in Jordan. 

The total height of the structure is 11.98m and the clear span bridging the two trussed piers is 9.60m. Each of the two piers of the gantry consists of four legs.

Location

Jordan

Client

Kanon

Our Scope of Work

Structural Design and Detailing

Technical Info

Height: 11.98m, Piers: 9.60m, 4 legs

Software

Autodesk Robot Structural Analysis