Elefsina 2022-2024
Technical Info: This is a study of 8 new bridges made of precast prestressed beams, each 40 meters long. A study was also conducted for the rehabilitation of the piers of the existing bridges, as well as for the temporary support of oil pipelines using a steel truss structure of approximately 40×40 meters. The entire project was carried out entirely using BIM technology.

Location

Elefsina

Client

Triton S.A.

Our Scope of Work

Structural Design

Software

SOFiSTiK, Revit, Robot Autodesk